Our new building is ready: R&D activity and electronic manufacturing are finally under the same roof!

This is a dream come true for us: from the very first idea of development until the very last phase of delivery of the ready product all steps are made at our premises in Budakalász from now on.

2022.04.01

Prolan in Signal und Draht

Since 2020 Prolan has also been represented on the editorial board of Signal und Draht, Europe's leading interlocking system magazine.

2021.11.15

SAFETY AND EFFICIENCY WITH DIGITALIZATION CONFERENCE IN PUSKÁS ARENA

The Railway Automation Division of Prolan Zrt. held a very prestigious professional conference and event on the 14th of October in the topic of safety, efficiency and digitalization.

2021.10.18

Festive editorial board meeting of Vasúti VezetékVilág journal

Prolan Zrt. hosted the festive editorial board meeting held on the occasion of the 100th publication of the Hungarian Railway Infrastructure Journal, which is called Vasúti VezetékVilág.

2021.10.12

Pillars Placed at Future Research and Development Centre

29 pillars are being placed at the building of the new research and development centre of Prolan. The pillars have a total weight of 130 tons and mean the most important contructional parts of the tuss.

2021.05.13

Plotting Board with Prolan Products

A small town with train model and Prolan products in miniature are exhibited on a plotting board crafted by motivated and creative Prolan-colleagues. The board itself was presented at a trade fair for energy industry in Germany. 

2021.05.06